Prelims Perspective: What needs to be learned?

  • What is it?
  • Associated Ministry
  • Features

Mains Perspective: Notes need to be prepared

What needs to be known?

  • What is it?
    • It is a centrally sponsored scheme aimed at providing all-weather road connectivity to eligible, previously unconnected rural habitations, thereby integrating villages with markets, schools, and healthcare facilities.
  • Associated Ministry: Ministry of Rural Development 
  • Phases
    • Phase I (Launched: December 2000): Focused on new connectivity to unconnected habitations.
    • Phase II (Approved: May 2013): Emphasized upgradation of existing rural roads in addition to new connectivity.
    • Road Connectivity Project for LWE Areas (Launched: 2016):
      • A separate vertical under PMGSY for Left Wing Extremism-affected areas.
      • Targets 44 districts (35 worst-affected + 9 adjoining districts).
      • Includes construction of roads with culverts and cross-drainage structures.
    • Phase III (Duration: 2019–20 to 2024–25):
      • Focus on the consolidation of existing rural road networks for better connectivity.
      • Covers routes linking agriculture markets, educational, and health institutions.

Source: PIB